Build a Resource Guru alternative

Build a Resource Guru alternative around people, dated allocations and an honest capacity grid. Catch overlapping work before adding calendar integrations.

  • vibe-coding

Build a Resource Guru alternative for the moment someone asks whether a teammate can take another project. Start with a capacity grid you can explain from the underlying rows.

The Resource Guru catalog prompt gives you the broader scope. Keep this first build to manually entered allocations. A colored calendar becomes useful when its totals have a clear meaning.

Build a Resource Guru alternative with daily capacity

Store availability as minutes per local date. A person who works six hours on Monday has 360 available minutes that day. An allocation consumes some of those minutes. A holiday changes availability, rather than pretending to be another client project.

You can run this calculation with Node.js:

const available = 360
const allocations = [120, 180, 90]
const allocated = allocations.reduce((sum, minutes) => sum + minutes, 0)
console.log({ allocated, remaining: available - allocated })

The result is 390 allocated minutes and -30 remaining minutes. Show the negative value. Clamping it to zero hides the scheduling problem you wanted to find.

Give allocations a calendar date

A daily planning tool can use dates without pretending every allocation is a meeting. Store 2026-11-16 as a date and let the person define their working calendar. Keep UTC timestamps separately for edit history.

Person(id, owner_id, name, timezone)
Capacity(person_id, local_date, available_minutes)
Allocation(id, person_id, project_id, local_date, minutes, revision)
Project(id, owner_id, title, archived_at)

Require positive allocation minutes. Refuse an allocation for an archived project. If no capacity row exists, display “capacity not configured” instead of silently assuming a standard workday.

Make the capacity grid inspectable

Clicking a cell should show every allocation contributing to its total. Include project labels and a link to edit the source row. A manager needs to explain why Wednesday is red without searching a separate report.

Cell Display Action
Capacity missing Not configured Set availability
No allocations Available minutes Add work
Work below capacity Remaining minutes Inspect allocations
Work above capacity Negative remainder Reassign or change plan

Keep a person’s planned time visible when you archive a project. Old records should still explain a previous plan. Prevent new allocations while retaining historical references.

Ask for one planning workflow

Build a private daily resource planner using Astro, HTMX, Alpine.js and SQL.
Create people, projects, dated capacity rows and minute allocations.
Show a week grid with allocated and remaining minutes per person per day.
Click a cell to inspect and edit its source allocations.
Mark missing capacity explicitly. Warn on over-allocation without hiding it.
Use revision checks so stale edits cannot overwrite another plan.
Do not sync calendars, track employee activity or send notifications.

Use a transaction when moving work between people. If the second write fails, leave the original allocation intact. For a stronger personal version, add a change preview showing both affected capacity totals before you commit.

Test the week that breaks your assumptions

Add a part-time teammate, a holiday and an allocation exceeding capacity. Then open two tabs and change the same allocation. One update should succeed; the other should retain its attempted input and explain the conflict.

Export dates, units and stable identifiers. Restore them into a fresh database and compare the weekly totals. Only then start adding a month view or import screen.

A basic planner covers manual allocations and a week grid. A stronger version needs recovery, permissions and conflict handling. Matching a commercial scheduling service adds integrations and continuing support. Use the scope guide to choose that boundary, and the Toggl guide if you also need a separate record of time actually worked.